Ground up,
foundation to finish.
The largest part of what Donkem does. Twenty-seven completed buildings: homes, churches, schools and student residences, taken from a cleared site to a signed handover.
The structure, end to end.
A building contract with Donkem covers the whole structure. We are not a labour supplier working inside somebody else’s programme.
Six stages, in this order.
- 01Brief and pricingYou send drawings or a description. We price the work and come back within one business day. We would rather ask two questions than guess at a number.
- 02ProgrammeA dated programme by trade, so you know what should be happening in any given week and can tell when it is not.
- 03GroundbreakThe site is set out and levels checked against the drawings before any concrete is poured.
- 04StructureThe frame goes up with heavy plant that is tested and load-certified before it is operated. No schedule is accelerated at the cost of safety.
- 05Finishes and snaggingFinishes to the specified schedule, then a snag list worked through with you rather than around you.
- 06Practical completionCertified by the supervising architect or project manager. Not declared by us.
The plant that does it, owned rather than hired.
Twenty-seven buildings,
named and located.
Every one of these is a real contract with a real address. Photographs are being added as they are collected from site.
EducationalWhitesands SchoolLekki, Lagos
On file · photograph pendingResidentialOniru Estate Twin BungalowsLekki Phase 1, Lagos
EcclesiasticalWinners Baptist ChurchUghelli, Delta State
EcclesiasticalCatholic Student Residence ChapelNsukka, Enugu State
EducationalLagoon College GrottoVictoria Island, Lagos
EcclesiasticalGoodnews Baptist ChurchSurulere, Lagos
EducationalCatholic Student ResidenceObolo Road, Nsukka
EducationalLantana College of Hospitality, Campus IIIIMT, Enugu State
EducationalLeadership & Development CentreSouthcreek Study Centre, Lekki, Lagos
ResidentialZariba ResidenceGitto Road, Mabushi, Abuja
EducationalEmerald Primary SchoolKm 32 Lagos-Ibadan Expressway, Ogun State
ResidentialIroto ResidenceIloti, Ijebu Ode, Ogun State
ResidentialResidence for Mr. OduGRA, Benin
EducationalCatholic Study & Residence CentreNigeria
EcclesiasticalDaughters of St. Paul ProjectNigeria
EducationalItamapako Training ProjectIloti, Ogun State
On file · photograph pendingResidentialLagoon School Staff HouseLekki Phase 1, Lagos
On file · photograph pendingEducationalGreendale University Residence & Women CentreNsukka, Enugu State
On file · photograph pendingResidentialResidential Development, Ologun Agbaje StreetVictoria Island, Lagos
On file · photograph pendingEcclesiasticalCommunity Church DevelopmentAraya, Isoko South LGA, Delta State
On file · photograph pendingResidentialResidential Development, Theophilus Orji StreetLekki Phase 1, Lagos
On file · photograph pendingResidentialResidence for Engr. Charles OsezuaLekki Phase 1, Lagos
On file · photograph pendingResidentialTwin Bungalow Development, Oke-IraAjah, Lagos
On file · photograph pendingResidentialResidential Development, IkoroduIkorodu, Lagos
On file · photograph pendingEcclesiasticalChapel of TransfigurationLUTH, Idi-Araba, Lagos
On file · photograph pendingResidentialResidence at Ilabere, IkoyiIkoyi, Lagos
On file · photograph pendingEducationalWhitesands School Kitchen ExtensionLekki Phase 1, Lagos
Before they commit.
Do you build from our architect’s drawings, or do you design as well?
Both. Most contracts arrive with drawings already prepared by the client’s architect and we build to them. If you do not have drawings yet, say so in the brief and we will tell you what is needed before anything can be priced properly.
Who is on site day to day?
Every contract runs through the same chain of responsibility, from the Managing Director down to the store keeper, so there is never a question of who owns a decision on site. You are given a person, not a switchboard.
Is your plant hired in?
No. Donkem runs a standing fleet, including 15 concrete mixers, 15 vibrators and 5,000 square metres of scaffold. A programme does not slip here because a hire company was busy.
How do I know the building was finished properly?
Practical completion is certified by the supervising architect or project manager rather than by us. Five of those independently signed certificates are published on the credentials page.
Most jobs need
more than one.
Talk to the people
who will build it.
Send the brief and we will price it, or reach the office directly. Either way you hear back within one business day.